我与么公激情完整视频_亚洲αⅴ无码天堂在线观看_涩涩视频污污成人版_成人免费毛片日韩毛片_国产精品性色综合av_中文字幕网站 五月网站_一级黄片大全_久久精品国产2020超碰_亚洲三级国产影视_av综合色区无码

Foshan Shengbang Steel Structure Co., Ltd.

11 years experience in plant design and construction

Common choice of 1875 sets of steel structure buildings

National service hotline:

0757-81002668
4News

Qingyuan steel structure operational processes

Hits:1731 Time:2016-5-18
  

Driven by the rapid development era Qingyuan steel under a lot of people I believe more and more steel, but the production of a steel warehouse is what process it? I think we still do not know it, here Katsukuni steel to share with Qingyuan steel project operation process - Further Reading (Foshan steel structure design specification relates to [New])

First, the purpose
Through scientific development of steel structure processes, improve renovation project management, standardization, specialization level.

 

Second, the operation flow chart


Third, the process described:
1, Qingyuan steel company must provide design and construction quality, and filing procedure (copy stamped with red chapter).
2, Qingyuan steel company must provide design drawings, construction program, there must stress calculations construction programs.
3, Qingyuan steel design drawings and programs must have designer (preparers) signed review signature, cover red chapter.
4, quotes Qingyuan steel companies to provide a single detailed list must be attached.
5, the designer should explain to customers the choice of steel the company's processes, the expression of the structural transformation of the company safety program seriously.
6, when designers and steel workers survey the scene, it is recommended to obtain steel designer personnel provisional valuation to first communicate with customers, if received, to do follow-Steel Company.
7, the project manager and the person in charge confirmed that the steel structure steel scene approach time and schedule requirements, incorporated into the construction schedule.
8, after the completion of construction steel Qingyuan, must complete acceptance of a single, acceptance of a single case of need stated construction quality, steel-site person in charge of the construction plan preparer, construction plan review, engineering director of each signature. Steel companies need red chop.
9, as the acceptance of a single steel structure material supply section and steel company payment (settlement) basis.
10, in accordance with the relevant provisions of the company's project manager steel company site management, construction quality of steel structures the course of inspection, if found quality problems and timely reported to the technology center, technology center after engineers determined approach to survey the scene.
11, by signing the original review processes.
12, needs structural reinforcement project (carbon fiber, bonded steel, anchorage, etc.) refer to this operation flow.