我与么公激情完整视频_亚洲αⅴ无码天堂在线观看_涩涩视频污污成人版_成人免费毛片日韩毛片_国产精品性色综合av_中文字幕网站 五月网站_一级黄片大全_久久精品国产2020超碰_亚洲三级国产影视_av综合色区无码

Foshan Shengbang Steel Structure Co., Ltd.

11 years experience in plant design and construction

Common choice of 1875 sets of steel structure buildings

National service hotline:

0757-81002668
4News

Method of Construction Quality Control for Foshan Steel Structure Project

Hits:1573 Time:2017-2-22
  

Method of Construction Quality Control for Foshan Steel Structure Project

The technical quality of the document, the preparation and review of the report is an important means of comprehensive control of the quality of the project, the specific content is as follows:

1, the production project

(1) audit construction plans, design changes, modify the map.

(2) test and preparation of the application of new technology, new technology, new materials, new structure of the technical appraisal book.

(3) the preparation and review of technical process documents (such as production instructions, technical guidance, painting essentials, packaging and shipping instructions, process), quality inspection documents (such as quality inspection documents, quality checklist, etc. ).

(4) the relevant materials, semi-finished product quality checklist and so on.

(5) timely feedback to reflect the quality of the process of dynamic statistical data or management charts.

(6) timely handling of the quality of the project accident, make a report, put forward appropriate corrective and preventive measures.

(7) do a good job of product acceptance delivery information.

2, the installation of the project

(1) the preparation and audit of the construction program and construction organization design, to ensure the quality of the project has reliable technical measures.

(2) audit the official start report, issued a start instruction.

(3) audit into the construction site of the subcontractor of the technical qualification documents, personnel qualification certificate.

(4) review the relevant materials, finished products, semi-finished product quality inspection refers to, material certificate, test report.

(5) review the construction drawings, design changes, modify the drawings and notice, agreement, instructions.

(6) the preparation and testing of the application of new technology, new technologies, new materials, new structure of the technical appraisal book.

(7) to do the process of handover inspection, sub-division of the project quality inspection report.

(8) timely handling of the quality of the accident, do a good job reporting, put forward appropriate corrective and preventive measures.

(9) timely feedback process quality dynamic statistical data or management charts.

(10) timely to do the project acceptance information.