An article mentioned according to the "notice" often appear in steel structure installation problems in shenbon steel structure are summarized the construction of steel structure grain, steel structure workshop, steel structure engineering experience of common problems in steel processing and installation of steel structures. The following scheme is given:
A steel column displacement control method: pouring concrete foundation before setting will chuck pre buried bolt according to the planning range stuck use, to prevent irrigation concrete attack displacement; low column plate reserved hole should be placed the sample that hole after the reserved hole. Two, steel column footing gap control measures: before hoisting the steel column, steel structure processing and installation should strictly control the foundation elevation, accurate measurement, and according to the measured value on the basis of the appearance of carefully leveling by two; such as grouting, open the irrigation hole in the base plate (as exhaust hole), using steel plate steel at the bottom of the column uneven pad, and pre planned elevation for column bearing plate, and then adopted two grouting. The three column, the big error control method: straight steel column should be according to the suspension point of accounting hoisting, and it is necessary to adopt measures for lifting more than two points, lifting should be temporarily fixed to prevent lifting deformation; column in place should be promptly added to the temporary support; the error should be corrected in straight, fixed before. State steel structural steel construction workers, in the installation of steel structure, pay attention to safety. If there are other common problems are also welcome to add.
The telephone: 0757-81002668/0757-63323396
Fax:0757-81196682
Company address: Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,