1.Steel structure office
SBS is specialized in manufacturing prefabricated steel structure Office with advanced production lines.Office is handling the affairs of a particular place or a place to provide services . Work is to provide office space, different types of businesses , office space vary by office equipment , office staff and other auxiliary equipment composition, put some in the office suitable working environment for people and things that really help , flower, paintings. Office , you can also refer to a body , such as district offices, district government offices, Party offices , etc., is a window to the outside unit , internal organs to assist leadership .
2.The detail material for the steel structure
The steel structure material is included the H section,I section,Square tube,Circular Tube,Floor decking steel sheet,C section,Z section,Angle iron , Steelbar ,Steel plate .
2)I beam
Hot rolled ordinary joist steel, also called steel beam, is strip steel with I-shape section.
Hot rolled I-shape beams can be divided into common i-steel and light beams.
Common i-steel
Main purpose: Ordinary beams are widely used in various building structures, Bridges, vehicles, support and machinery, etc.
Light beams
Flange of common i-steel and light beams are gradually becoming thinner from root to the edge with certain angle. Compared with ordinary beams, hot rolling light beams has wider leg and thinner waist in same wait height conditions. Guaranteed the bearing capacity, the light beams have better stability, metal saving and better economic effect than ordinary beams.
Main use: The same with ordinary beams, it is mainly used in factories, Bridges and other large structures and vehicle manufacturing, etc.
3、Provide data
Item Name | Steel structure building |
Size | Length, Width, Roof height and Eave Height |
Roof and Wall | PU, EPS, Rock Wool sandwich panel |
Door and Window | PVC or Aluminum Alloy |
Column and Beam | Hot rolled H section , I section or Galvanized |
Purlin | C-Section and Z-section |
Surface | 2 primer and 1 finished paint |
Local Climate | 1. wind speed 2. Rain load 3. Snow load 4. Earthquake grade if any, etc. |
Crane parameter | If need crane beam, parameter is in need. |
Drawing | 1. Quote as clients' drawing 2. Design as per clients' requests. |
Package | In container or as per requests. |
Load in | 20 ft', 40 ft' GP, /HQ/OT container |
4.Transportation:
Steel structure is mainly composed of steel column, steel beam, steel frame and the rigid support and so on, so steel structure component volume is larger, The mainly transportation for export is as follow:
1)40'HQ and 40'open top container
In general, after customer order, our engineering technology department design the steel structures will be according to the 40 'HQ and 40' open top container inside size to design the shipment, in most cases, we use 40 'HQ and 40' open top shipping container shipment to pack steel structures.
2)Break bulk
At special circumstances, some large construction size will be more than 40 'HQ and 40' open top containers internal dimensions, we suggest customer use trucks, flatbed trailer etc to transport the large construction component to the pier from the factory, then ship by port lifting, so while booking space,customers should book the break bulk. We will cooperate with the customer to provide them the size and weight of the goods, in order to book a reasonable space.
Remark:
When components are shipped to the site, due to various reasons of transport may cause component deformation (generally for bending, damage to the paint film, etc.), can be in the scene to correct, at present the correction method is generally divided into cold straightening and hot straightening.
For bending component, do the mechanical gagging with oil pump, also can use flame (C2H2 and pure oxygen mixed) to the hot straightening, after correction, the paint film that damaged must be repaired.
5.Guidance installation
Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:
Customer should provide:
1) Translator or assistant on site.
2.)All costs raised including:
A. visa fee
B. Round trip flight ticket
C. Accident insurance for the supervisor during the period
D. Accommodation
E. Daily meals
F. Internet
G. Local traffic fee (if any)
3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
4)Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
There have some guidance installation picture:
6、Service flow path:
Discussing Project——Design Plan Drawing——Budget & Quote——Confirm Drawing&Quotation——Sign the Contract——Make the shop Drawing——Manufacturing——Transportation——Shipping——Foundation Ready——Guidance Installation——Finshed Installation
6、Application range-Industry
Industry steel structure included warehouse,workshop,garage,hangar,platform.
Steel structure features of high fire resistance, strong corrosion resistance. Industry steel structure warehouse usually made of steel beams, steel columns, steel trusses and other components of the composition; each component using welds, bolts or rivets to connect. The usage scale includes large-scale workshop, or used for the warehouse, supermarkets, entertainment centers and modular steel structure garage.
FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
Foshan, Guangdong Province, China
Tel:0086-757-63323396 0086-18900873268 Fax:0086-757-81196682
Tel